top of page

Driveway Care Guide 

A new asphalt driveway is an investment — a little care in the first few months keeps it looking and performing like new for years to come.

RESOURCES

The How, Why & When 

KEEP IT LOOKING FRESH

WHAT TO DO

Give it time to cure. Stay off with vehicles for 1-2 days; hold off parking for 2-3 days.

​

Drive gently. Slow starts, slow stops, wide turns - sharp steering while stationary can scuff the surface.

​

Cool it down in summer heat. A quick hose-down on hot days helps it firm up faster.

​

Get it seal coated 1 year after paving

​

Keep edges trimmed and supported. Cut back grass and weeds; backfill exposed edges.

​

Fill cracks as they show up. A few hairline cracks each spring are normal here - seal them.

WHAT TO AVOID

Don't park in the same spot every time during the first season - rotate for even curing.

​

Don't let oil or gas sit. Clean spills right away; park leaky vehicles elsewhere.

​

Don't leave heavy items in one spot. Slide plywood under jacks and tires for long-term parking.

​

Don't park within 6 inches of an edge. Edges lack support and can crack under weight.

​

Don't worry about uneven texture. Slight variations in sand and stone are completely normal.

​

Don't ignore small cracks. Left alone they let in water and worsen over winter.

Kelowna Asphalt Pour with Roller
Vernon BC Asphalt Driveway
Okanagan Asphalt Driveway
Vernon Asphalt Driveway paver
Kamloops Asphalt Driveway Roller
Silver Star Home Asphalt Driveway

QUESTIONS ABOUT YOUR DRIVEWAY

Our crew has decades of experience paving and maintaining driveways across the Okanagan. If something doesn't look right, or you just want a second opinion, get in touch.

call 250 306 1925_edited_edited_edited.p
Action Paving logo 2

Phone: (250) 306-1925
Email: info@actionpaving.ca

Vernon Equipment Yard: 4605 23 St B, Vernon, BC

Kelowna Office: 347 Leon Avenue, Kelowna, BC


Not open to walk-ins. Call or request a quote and we’ll come to you.

bottom of page